Electrical Panel Upgrade in Wasatch County, Utah
Same-day electrical panel upgrade across every city in Wasatch County, Utah. Free in-home estimates, transparent pricing, 500+ five-star reviews.
Wasatch County has a mix of housing eras, so panel work here ranges from FPE Stab-Lok rip-and-replace on 1970s homes to dedicated EV-charger circuits in 2010+ builds. A service upgrade also gives you whole-home surge protection (which costs $1,200–$3,000 to add later) and breaker space for the next 20 years of additions. Every panel we install is permitted, inspected, and tied directly to Wasatch County utility coordination — we handle the meter pull and the inspection scheduling so you don't have to.
Wasatch County Coverage
Electrical Panel Upgrade in every Wasatch County city
Click your city for pricing and same-day availability tailored to your specific address.
Electrical Panel Upgrade in Heber City
84032 · Heber City, Utah
See pricingElectrical Panel Upgrade in Midway
84049 · Midway, Utah
See pricingElectrical Panel Upgrade in Daniel
84032 · Daniel, Utah
See pricingElectrical Panel Upgrade in Charleston
84032 · Charleston, Utah
See pricingElectrical Panel Upgrade in Wallsburg
84082 · Wallsburg, Utah
See pricingElectrical Panel Upgrade in Hideout
84036 · Hideout, Utah
See pricingElectrical Panel Upgrade in Timber Lakes
84032 · Timber Lakes, Utah
See pricingCommon questions
Electrical Panel Upgrade FAQs · Wasatch County
How much does a 100A → 200A panel upgrade cost in Wasatch County?
Standard 200A service upgrade: $2,200–$3,800 installed and permitted. If we're also replacing FPE Stab-Lok or Pushmatic with new breakers, factor in $300–$800 more. Adding a whole-home surge protector during the upgrade: $250–$500 (a steep discount vs adding it later).
Why do I need a panel upgrade?
Most common triggers: insurance company flagging an FPE/Stab-Lok or Pushmatic panel, plans to install an EV charger or heat pump that won't fit on existing service, frequent breaker trips, no available slots for new circuits. Plus, real estate inspectors flag 100A service as a buyer-credit issue at sale.
Are FPE Stab-Lok and Pushmatic panels really dangerous?
Both have been studied extensively. FPE Stab-Lok breakers fail to trip during overload at unacceptable rates (some testing shows 25–50% failure). Pushmatic uses a unique latching mechanism that wears out and arcs. Most insurance carriers now require replacement before issuing or renewing policy. We replace dozens of these per year in Wasatch County.
How long does a panel upgrade take?
One day, typically 6–9 hours. Power is off for 4–6 of those hours. We coordinate with Rocky Mountain Power for the meter pull and re-energize. Outage notice is ~24 hours in advance.
Do you install EV charger circuits during the upgrade?
Yes — and we recommend it. Adding a 50A 240V circuit at the same time as the panel upgrade saves $400–$700 vs adding it later. We pull dedicated 6-AWG copper to your garage, install a hard-wired Tesla Wall Connector / ChargePoint / generic NEMA 14-50 outlet — your call on the EVSE.
Same service, other counties
Electrical Panel Upgrade elsewhere in Utah
Other services in Wasatch County
We do more in Wasatch County
Ready for electrical panel upgrade in Wasatch County?
We answer the phone in under a minute. Same-day dispatch on most repairs in Wasatch County, Utah.