(801) 407-9320
Home/Service Areas/Wasatch County/EV Charger Installation
Wasatch County, Utah · 9 cities

EV Charger Installation in Wasatch County, Utah

Same-day ev charger installation across every city in Wasatch County, Utah. Free in-home estimates, transparent pricing, 500+ five-star reviews.

Licensed & Insured 4.9 / 5 (500+ reviews) AHRI Certified 24/7 Emergency Line

EV charger installs in Wasatch County have exploded over the last 3 years as Tesla, Rivian, Ford F-150 Lightning, and Chevy Bolt adoption climbs in Utah. Most Wasatch County homes need a Level 2 (240V) charger to charge overnight at usable speeds, 25-40 miles of range per hour. The install depends on three things: (1) how far from your electrical panel you need the charger (every foot of conduit run costs $), (2) whether your panel has the spare 50-amp breaker space (200-amp panels usually yes, 150-amp panels often no), (3) whether you want a hardwired install or a NEMA 14-50 outlet (we recommend hardwired for 48-amp+ EVSEs because the outlets fail). Every install gets permits pulled and inspected by the Wasatch County electrical inspector.

Common questions

EV Charger Installation FAQs · Wasatch County

How much does EV charger installation cost in Wasatch County?

It depends on the distance from the panel to the charger (within 25 ft, 25-50 ft through finished walls, or a long run that needs a sub-panel or buried conduit) and whether the panel needs an upgrade to 200A. The charger itself is customer-supplied (Tesla, ChargePoint, etc). The in-home estimate is free, and you get the flat-rate price in writing before any work starts.

Do I need a panel upgrade for an EV charger in my Wasatch County home?

Usually no if you have a 200-amp panel with spare breaker space. Usually yes if you have a 100-amp panel (very common in Wasatch County homes built before 1995) - upgrading to 200A is required to add the 50-amp EV circuit safely. Tesla Wall Connector at 48 amps requires a 60-amp breaker, which is the breaking point for some 150A panels.

Should I get a hardwired EV charger or a NEMA 14-50 outlet?

For 32-amp chargers: outlet is fine and gives you portability. For 40-48 amp chargers (Tesla Wall Connector at full power, ChargePoint Home Flex high setting): hardwired is the right call - NEMA 14-50 outlets are not rated for continuous high-amperage and several brands have had outlet melt failures at high draw. We default to hardwired unless you specifically need the outlet flexibility.

Will my electric bill increase noticeably from EV charging in Wasatch County?

Yes, but less than you think. Charging at Rocky Mountain Power off-peak overnight rates usually costs a fraction of what the same miles cost in gas, so most Wasatch County EV owners come out well ahead. We can set up the charger schedule to only charge during off-peak hours if you have time-of-use billing.

Does Wasatch County require permits for EV charger installation?

Yes - every Level 2 install needs a permit from the Wasatch County building/electrical department. We pull the permit, schedule the inspector, and handle the signoff as part of the install. You don't coordinate with the city. The permit fee is included in our quote.

Ready for ev charger installation in Wasatch County?

We answer the phone in under a minute. Same-day dispatch on most repairs in Wasatch County, Utah.